Here we are again preparing to present to our legislative committees the need for a new high school. prepared by Lil manthei and ted rowland


Takini High School is getting ready for the 2010/2011 school year to begin. At this time last year, Takini high school was utilizing a building that had previously been condemned. This temporary high school was necessary while waiting for five new units which were being sent to replace previous units that had been destroyed by weather the previous year. The new units finally arrived in late September early October, and where ready for occupation the last week in November. In January of 2010, a winter storm caused a power outage that lasted for two weeks. Due to no heat in the new units, all the water lines and sewers lines were frozen and broke; which caused flooding and damage to the new units.

Takini High School first opened twenty years ago. Historically, the children who graduated from the elementary schools located in Red Scaffold, Cherry Creek, and Bridger had to travel to the BIA Boarding School in Eagle Butte, approximately 100 miles away, if they wanted a high school education. At that time, the school in Red Scaffold was a K-9 system, the school in Cherry Creek was a K-6 system, and the school in Bridger was a K-8 system. In 1986 the Red Scaffold School Board contracted with the BIA to start a high school in Red Scaffold.

The Contract Grant School in Red Scaffold was a K-12 system with approximately 180 students. The physical plant consisted of the main building, which contained a library, offices, and high school classrooms, and six portable elementary classrooms. The Red Scaffold School Board leased the multipurpose gymnasium and the cafeteria and kitchen facilities from the community of Red Scaffold.

The elementary schools located in Bridger and Cherry Creek were both BIA-operated schools and were apparently determined to be adequate to serve the educational needs of the student populations from those communities. Approximately 70 students were enrolled in the K-6 system in Cherry Creek and approximately 35 students were enrolled in the K-8 system in Bridger. For the first time in history, parents were able to walk their children to school in their own community.

Progress was being made. Indian education had evolved from students being taken away from their parents when they were six years old, sent hundreds of miles away, and returned when they were 16-18 years old, to students attending elementary school in their communities and then traveling to the east end of the reservation for high school, to students attending elementary school in their communities and then high school on the west end.

The new facility was designed as an elementary school but the academic program was expanded to include high school. The BIA approved the expansion when they granted a high school to the west end. Since Takini School opened in 1989, high school classes have been taught in temporary facilities. In accordance with federal government regulations, these students have been classified as un-housed students.

To develop an outstanding academic program, we must have at least an adequate facility. This is what we want and this is what we need. At the present time 195 students are enrolled at Takini School, 136 elementary and 59 high school. At that time, the high school was housed in a metal structure that was referred to as the Blue building. This building was utilized until 1993/94. At that time, it was determined that a more permanent structure was necessary. So, five modular units were brought in temporarily, until a permanent structure could be built. These temporary units were used until 2008, when spring storm damage caused them to become unusable.

When this damage occurred, it was determined that it was necessary for a more permanent structure to be built to house Takini High School. Since it was an emergency situation, five more temporary modular units were brought into Takini to house the high school until a permanent structure could be provided. Again Takini High School was utilizing temporary accommodations.

Here we are again, at the beginning of another school year, in temporary units that have sustained serious damage due the sever weather conditions of our area.

The 1868 Fort Laramie Treaty Article VII states:
“… the necessity of education is admitted, especially of such of them as are or may be settled on said agricultural reservations, and they, therefore, pledge themselves to compel their children, male and female, between the ages of six and sixteen years, to attend school, and it is hereby made the duty of the agent for said Indians to see that this stipulation is strictly complied with; and the United States agrees that for every thirty children between said ages, who can be induced or compelled to attend school, a house shall be provided, and a teacher competent to teach…”

This section of the 1868 treaty guarantees Lakota children the right to education in buildings that are safe and equipped to ensure a quality education. Minniconjou leaders like One Horn, Iron Horn, Blue Cloud and Spotted Elk signed this paper with the assurance that they were providing a future for their descendants.

When Lakota students at Takini School, on the Cheyenne River Sioux Reservation in western South Dakota are learning about this treaty, they look around their classrooms at water stained carpets and ceilings caving in above their heads. The air is thick with the musty, dank smell of mildew and mold. They see bathrooms that are not useable. They wonder what the Minniconjou leaders, their great-great-grandfathers, who signed this treaty, would think of the conditions of their grandchildren’s education system.

Friday, February 26, 2010

Check out this video: Takini

Check out this video: Takini

Saturday, February 20, 2010

This blog was first created to show case some of the events at Takini High School.

Nqw it has become a tool for us to show what is happening with our buildings and the conditions in which we are holding classes.

There are no bathrooms in the high school units at this time...

There is no water to use for hand washing and our drinking water is bottled.

The carpets have all had water damage and there is water damage spots in the ceilings..
There are signs of cracking in the corners and petitions in the units.

We are seeking support in our quest for a permanent high school building so we no longer have to contend with these issues


Snow blowing in under the doors in the new classrooms.


Trying to catch dripping water from broken water pipes.






Damages after power outage and freezing temperatures in Dec and Jan




Water soaked boxes of computer paper . Water pipes broke in walls and caused flooding in the new classrooms.







The new temporary buildings brought in September 2009

Since its inception in 1989, Takini High School has been housed in temporary buildings. The temporary facilities included: six single double-wide trailer units; which housed five secondary academic classrooms and the special education administrative offices. The high school administration, the alternative classroom, and the Talented and Gifted Program were located in a tin building which was located adjacent to the portable classrooms. Science, computers, and art were located in the Elementary building.
The spring storms in 2009 caused excessive damage to the trailer units and the tin building. The facilities became unsafe for students and staff to occupy, because high winds had forced snow into the ceiling areas which caused them to collapse. The trailer units were not able to be repaired to enable any occupation. The tin building was repaired to enable some occupation. All of the high schools with the exception of the three classrooms in the elementary building were relocated to the tin building. Talented and Gifted program and the art classes shared a room in the elementary building.
In April of 2009, Takini School began working closely with Dr. Cheri Farlee, ELO, Cheyenne Eagle Butte, and Mr. Dennis Rodrigues, BIA Facilities Management, Alburquerque, New Mexico. As a result, five new double-wide temporary classrooms; which house two separate classrooms and two restroom facilities for boys and girls were brought in from New Mexico and set up in the same location as the previous temporary trailers.
Students and staff moved into these new units in November. The first cold weather, in December, caused water pipes to freeze and break in the new units. Then, the snow and ice storm in January which caused power outages and broken water mains throughout the area caused broken water pipes and frozen sewer lines in the new units. Broken pipes caused flooding in the new units. Takini High School students and staff have now been without bathroom facilities in the classrooms since the middle of January.
The students and staff of Takini High School have been very patient in their wait for a permanent high school facility in which to learn, grow, and prosper.

Labels: ,

Sunday, December 13, 2009

August 26, 2009
Written by Lil

The 1868 Fort Laramie Treaty Article VII “ARTICLE VII.
… the necessity of education is admitted, especially of such of them as are or may be settled on said agricultural reservations, and they, therefore, pledge themselves to compel their children, male and female, between the ages of six and sixteen years, to attend school, and it is hereby made the duty of the agent for said Indians to see that this stipulation is strictly complied with; and the United States agrees that for every thirty children between said ages, who can be induced or compelled to attend school, a house shall be provided, and a teacher competent to teach…”

This section of the 1868 treaty guarantees Lakota children the right to education in buildings that are safe and equipped to ensure a quality education. When teaching about this treaty to Lakota students at Takini School, on the Cheyenne River Sioux Reservation in western South Dakota, they look around at water stained carpets and ceilings caving in above their heads. The air is thick with the musty, dank smell of mildew and mold. They wonder what the Minneconjou leaders,(their great great grandfathers) who signed this treaty would think of the conditions their grandchildren’s education system. Minneconjou leaders like One Horn, Iron Horn, Blue Cloud and Spotted Elk signed this paper with the assurance that they were providing a future for their descendants.

At this time, Takini students are again preparing to move into a second set of modular classrooms that are supposed to be temporary until a more permanent structure can be provided. The first set of this modular units were intended to be used for approximately five years, but they were in use for over fifteen years until spring storms destroyed roofs and ceilings. Takini School is concerned now with the arrival of these second set of modular units that are to be temporary for only a few years. We believe our students deserve a permanent structure for their education.

TED Rowland Takini School Superintendent


This report shall serve as the justification to the Bureau of Indian Education and to the Bureau of Indian Education Facilities Management programs that the Takini School has been, and still is, waiting for the buildings to properly accommodate the addition of grades 10-12 to the originally planned facilities for grades K-9.

This is a brief overview of what transpired in the 1980s on the western end of the Cheyenne River Indian Reservation. Historically, the children who graduated from the elementary schools located in Red Scaffold, Cherry Creek, and Bridger had to travel to the BIA Boarding School in Eagle Butte, approximately 100 miles away, if they wanted a high school education. At that time, the school in Red Scaffold was a K-9 system, the school in Cherry Creek was a K-6 system, and the school in Bridger was a K-8 system. In 1986 the Red Scaffold School Board contracted with the BIA to start a high school in Red Scaffold.

The Contract Grant School in Red Scaffold was a K-12 system with approximately 180 students. The physical plant consisted of the main building, which contained a library, offices, and high school classrooms, and six portable elementary classrooms. The Red Scaffold School Board leased the multipurpose gymnasium and the cafeteria and kitchen facilities from the community of Red Scaffold.

The elementary schools located in Bridger and Cherry Creek were both BIA-operated schools and were apparently determined to be adequate to serve the educational needs of the student populations from those communities. Approximately 70 students were enrolled in the K-6 system in Cherry Creek and approximately 35 students were enrolled in the K-8 system in Bridger. For the first time in history, parents were able to walk their children to school in their own community.

Progress was being made. Indian education had evolved from students being taken away from their parents when they were six years old, sent hundreds of miles away, and returned when they were 16-18 years old, to students attending elementary school in their communities and then traveling to the east end of the reservation for high school, to students attending elementary school in their communities and then high school on the west end.

As a result of the BIA decision to build a K-9 school in a central location, the elementary buildings in all three communities were demolished. The new facility was not designed to accommodate grades 10-12.

Progress was halted. In fact, Indian education, from the perspective of local Lakota families, had deteriorated. The elementary schools in the communities were torn down, the new facility was built for only K-9, and students needed bus transportation to attend elementary school when before they could walk to school.

The new facility was designed as an elementary school but the academic program was expanded to include high school. The BIA approved the expansion when they granted a high school to the west end. Since Takini School opened in 1989, high school classes have been taught in temporary facilities. In accordance with federal government regulations, these students have been classified as un-housed students.

To develop an outstanding academic program, we must have at least an adequate facility. This is what we want and this is what we need. At the present time 195 students are enrolled at Takini School, 136 elementary and 59 high school. They attend school in the deplorable conditions pictured in these photographs.














































SEPTEMBER 2009









TEMPORARY BUILDING HAD ALREADY BEEN CONDEMNED BEFORE THE STORM DAMAGE. WE BE GAN CLASSES I NTHIS BUILDING IN SEPTEMBER BECAUSE WE HAD NO OTHER PLACE TO HOLD SCHOOL





THIS BUILDING IS CALLED THE BLUE BUILDING



















Labels: , , , ,


TAKINI HIGH SCHOOL 2006



HISTORY OF TAKINI SCHOOL WM,VH,TR

In 1979 Red Scaffold School Board entered into negotiations with the BIA to build a new school for K-9 on the west end of the Cheyenne River Reservation. (Red Scaffold already had a K-9 system in place.) Originally, the Red Scaffold School Board and the community of Red Scaffold wanted the new building to be located at the junction of roads leading to Red Scaffold, Cherry Creek, and Dupree next to the Beaver Widow homestead on donated land. In the early 80s, 4.5 million dollars was appropriated to build the school.

At this time a movement began to consolidate the schools in Red Scaffold, Cherry Creek, and Bridger. The BIA decided to locate the new school in between the three communities of Red Scaffold, Cherry Creek, and Bridger.

The infrastructure for electricity, water, and roads was already present at the originally planned site, but it was not present at the location selected by the BIA. Three-phase electricity was established at a cost of 1.5 million dollars, which was taken from the 4.5 million dollars appropriated for the new school. A two-inch water line that ran for the last 7 or 8 miles was replaced with a six or eight-inch water line in order to fill the water tower with water for drinking and safety purposes. A new road leading from Red Scaffold to the new site, with a major bridge over Ash Creek, was built. Because it was necessary to spend a couple of million dollars of the appropriated money on these projects, the plans for the new building had to be downsized significantly.

In 1986 Red Scaffold School Board contracted with the BIA to start a high school. The plans that were developed to house students in grades K-9 were not altered.

At this time the K-6 schools in Cherry Creek and Bridger were BIA operated. The K-12 school in Red Scaffold was a Contract School. The CRST Council mandated an election to determine how the new school would be operated. The first vote resulted in a tie; contract won by one ballot in the second election. A special election was held to elect School Board members. Two members from each of the three communities and one member-at-large were elected: Harold Condon, Lucy Etzkorn, Dorothy Strikes Enemy, Ramona Red Horse, Mary Jane Good Shield, Deloria Straighthead, and Jess Knight were elected.

The new K-12 school opened in 1989, with an enrollment of over 300 in a building designed for 225 elementary children. In 1991, with money in the school budget, the Takini School Board built a metal building, which included seven classrooms and two administrative offices. In 1992 the Takini School Board built a small metal multi-purpose gymnasium. In 1994 six modular units were added to the campus to house the high school classes.

Initially five modular houses were built to accommodate teachers. Over the years Takini School Board negotiated with lending institutions to purchase twenty-some trailers for teacher housing. (The closest community with rental possibilities is approximately 100 miles away.)












Photos of damage to classrooms in the spring of 2009

July 30, 2009



Takini School administrators and staff are requesting your assistance with a serious issue regarding our high school. For the last sixteen years, the high school has been housed in temporary modular units that were intended to be used until a new high school could be built. The time frame, at that time, was five years. As you can see, that time period was not met.
Last spring, these buildings were severely damaged due to heavy snows. The Bureau of Indian Affairs office of construction management told us that they would bring new temporary buildings and place them on temporary foundations, and that we would be placed on the high priority list for a new high school. They also said they would place these new temporary buildings on the east side of our current gymnasium.
Which leads us to our current dilemma; the BIA office of construction management has now decided to place the temporary classrooms on permanent structures and to place them in the same area where the damaged classrooms are located. These decisions were made without consulting Takini School administration. We had been planning our upcoming school year around the plans that had been made in the spring. This change greatly affects the beginning of our school year. The issues are: 1. the current location is not large enough to accommodate the new classrooms. 2. It is already the end of July and there is not enough time left to make all the adjustments that will be necessary. Even if the new classrooms are placed in the original area that had been agreed, the time period is still not enough to prepare them to be ready for the beginning of school. 3. BIA office of construction will not give us a date on when they will begin to do any of the work. 4. Since these new classrooms are being placed on permanent foundations, it leads us to believe that we are no longer on the high priority list for a new high school.
These are some of the reasons we are asking for your assistance. Our administration has tried to communicate with the BIA office of construction, but does not get any response to phone calls or emails. Our superintendent has already made two trips to Albuquerque without receiving any satisfaction to our concerns.
We are requesting the support of the congressional offices to ask the BIA Office of Construction Management, Mr. Dennis Rodriguez, to reconsider the location of the new portable classrooms. The reasons being that once and for all the high school would be located in its own area on the east side of the campus. The area where the classrooms are now located require the high school students to walk through the elementary hall wall to get to the nurses office, the library, the gymnasium, and the cafeteria. The movement of high school students through this hallway disrupts elementary classrooms continually. It is imperative that this decision be reversed. Teacher time spent monitoring the hallway takes away from time that would be better utilized in the classroom.
Our first priority now, is to accommodate our students that will be coming in on September 08, 2009. They deserve to have things in order and ready for their arrival. If the year begins disorganized, it will affect the learning of our students, and the productivity of our staff. At this point, we are at a loss as to what our accommodations will be for the start of school. After requests of assistance through the Bureau of Indian Education, they recommended that we contact our congressional delegation.

Labels: , , , , ,

Sunday, November 22, 2009







Takini School Tipi Raising



November 2009



Senior Class 2010
















Takini School





November 2009





Tipi Raising





Junior Class of 2011





Takini School Tipi Raising
November 2009
Sophomore Class of 2012






NOVEMBER 2009
TAKINI SCHOOL TIPI RAISING
Freshman Class of 2013

Labels: , , , ,